City of Paso Robles
Paso Robles, California
The Golden Hill Road and Union Road Roundabout Project involved reconstruction of an existing stop-controlled intersection in Paso Robles, California. During the design phase of the project, Earth Systems performed subsurface exploration and laboratory testing to aid in the development of roadway reconstruction recommendations and provided consultation during discussions of project construction phasing and specification development.
During the construction phase, the intersection reconstruction included pulverization, Full-Depth Reclamation with Cement (FDR-C), Class II aggregate base placement, minor concrete, HMA paving, and utility trench backfill. Earth Systems worked closely with the project owner, design team, construction management team and contractor during the construction phase of the project.
Our services consisted of compaction testing of sewer and water line backfill; observation and testing during FDR-C operations; inspection of HMA placement and associated materials testing; and compaction testing in areas where native soil and aggregate base required compaction. As a result of the collaborative effort during design and construction, the projected construction timeline for the project was reduced by several months.