City of Atascadero
Atascadero, California
The Downtown District Pavement Rehabilitation Project restored pavement conditions on 1.5 miles of roadways within the Atascadero downtown core area. The project also incorporated minor drainage improvements at localized areas, and replacement of concrete curb returns at multiple locations where existing returns do not meet current ADA requirements. Pavement restoration was performed on several downtown streets, including Entrada, Traffic Way, Palma Avenue, East and West Mall, Lewis Avenue, Olmeda Avenue, and several City alleyways.

In 2022, Earth Systems provided a geotechnical engineering investigation. Coring and drilling of existing pavement was performed at intervals and samples were obtained. The geotechnical report presented a discussion of the existing soil and pavement conditions along each segment of roadway, and specific, street by street recommendations for repair, rehabilitation, or reconstruction.

During construction, Earth Systems provided materials testing and inspection including:

We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Vimeo is a video hosting platform for high-quality content, ideal for creators and businesses to showcase their work.
Service URL: vimeo.com (opens in a new window)