City of Atascadero
Atascadero, California
The Downtown District Pavement Rehabilitation Project restored pavement conditions on 1.5 miles of roadways within the Atascadero downtown core area. The project also incorporated minor drainage improvements at localized areas, and replacement of concrete curb returns at multiple locations where existing returns do not meet current ADA requirements. Pavement restoration was performed on several downtown streets, including Entrada, Traffic Way, Palma Avenue, East and West Mall, Lewis Avenue, Olmeda Avenue, and several City alleyways.
In 2022, Earth Systems provided a geotechnical engineering investigation. Coring and drilling of existing pavement was performed at intervals and samples were obtained. The geotechnical report presented a discussion of the existing soil and pavement conditions along each segment of roadway, and specific, street by street recommendations for repair, rehabilitation, or reconstruction.
During construction, Earth Systems provided materials testing and inspection including: