BFS Landscape Architects
Salinas, California
Earth Systems provided a geotechnical engineering report for the Closter Park Revitalization project, which included construction of a 10-foot wide fitness loop, fitness stations, new bleachers at a sports field, new and relocated restroom, concession, and storage buildings, amphitheater-style seating, a relocated water fountain, a farmer’s market/multi-use space, a gazebo structure, bioifiltration/water quality treatment areas, and pervious paving.

Earth Systems’ scope of work included a site reconnaissance, subsurface exploration, infiltration testing, laboratory testing of soil samples, evaluation and analysis of field and laboratory data, and preparation of a geotechnical report. The report addressed site preparation and grading, soil expansion potential, and groundwater, and provided geotechnical criteria for design and development of the proposed improvements.

We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Vimeo is a video hosting platform for high-quality content, ideal for creators and businesses to showcase their work.
Service URL: vimeo.com (opens in a new window)