Waterways Consulting Inc.
Santa Barbara, California
This open-space park in Las Positas Valley along Arroyo Burro was acquired in 2016. A creek restoration project was completed in 2018, which included improving existing walking trails and providing creek-viewing areas. Earth Systems was retained to conduct a geotechnical engineering investigation for the bridge portion of the project. Phase two of this project was completed in 2022, and now a multi-use path for bikes and pedestrians crosses over a new footbridge into the park from Las Positas Road.


Earth Systems’ scope of work included subsurface exploration, coring, infiltration testing, laboratory analysis of selected soil samples, geotechnical analysis, and preparation of a geotechnical engineering report. The report addressed the findings of the subsurface exploration program, soil and groundwater conditions, geologic hazards, and provided geotechnical recommendations for grading, bridge and wingwall foundations, and frictional and lateral coefficients for project design.

We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Vimeo is a video hosting platform for high-quality content, ideal for creators and businesses to showcase their work.
Service URL: vimeo.com (opens in a new window)