The Washington Street Bridge stretches over the Whitewater River Channel in La Quinta, CA. Earth Systems performed a soils engineering investigation for the widening to six lanes of the original two-lane bridge. The project included roadway improvements for approaches to the bridge. A soils engineering investigation, and testing and inspection of construction materials, were also a part of this project.


