The oldĀ Salinas River Bridge at Las Pilitas Road was replaced with a cast-in-place concrete structure supported by drilled cast-in-place concrete caissons. The road was realigned and earthen embankments were constructed on each side. The new bridge spans approximately 200 feet. Earth Systems was retained to perform sampling and testing of concrete and rock during construction.