Constructed over 67 feet of landfill, the Hull II Wind Energy Project includes a Vestas V-80 1.8-megawatt turbine on an 80-meter tower. The tower is supported on a Patrick and Henderson pile anchor foundation. Two rows of piles were driven to dense rock and rock anchors were extended below.

This project was featured at 2006 AWEA Conference. Earth Systems provided engineering design support for the project.