Captured in Progress is a concrete pour at the Pioneer Valley High School in Santa Maria, CA. (Photo by Ted Cios, Earth Systems)

Pioneer Valley HS Performing Arts
Pioneer Valley HS Performing Arts

This concrete pour is for the slab of the new Performing Arts Center on the campus.

Earth Systems is performing all the testing and inspection for the project:

  • Soils Testing
  • Concrete Sampling
  • Concrete Testing
  • Masonry Inspection
  • Welding Inspection
  • Bolting Inspection